Public Policy Campaign to Enable a Solution to Operation Stack M20. 32 days of Operation Stack in 2015 Cost Business STG 8 Billion (Source: Port of Dover, Freight Transport Association)

Operation Stack Solution Location

Kent County Council’s proposed lorry park solution to Operation Stack, (a result of Dr Rehan ul-Haq’s strategic infrastructure alliance, founded in 2000) is on the land located adjacent to the London bound carriageway of the M20 at the South East of Ashford, between the M20, the A20, the High Speed Railway and the Electricity Converter Station at Sellindge-Evegate/Aldington, Ashford, Kent.

Ashford, Kent, 35 minutes from St Pancreas International Station, London, via. Ashford International Station, has high amenity value and low residential and office costs. Ashford has excellent links with Europe by train (Ashford International Station and Eurostar), by ferry (Dover Harbour) and by air (London Ashford Airport at Lydd).